Steel structures & modular buildings — factory direct Become a partner WhatsApp: +86 157 1383 3389
BST / PRODUCTS

Single Storey Steel Structure Workshop

Steel Structure Building Series

Our Single Storey Steel Structure Workshop is designed for durability, efficiency, and cost-effectiveness, these structures are ideal for manufacturing plants, warehouses, and other large-scale facilities. Constructed with high-quality stee

Key specifications

Category
Specifications
– Steel Columns
H-section, box columns, material Q235/Q345
– Steel Beams
H-section, material Q235/Q345
– Roof Truss
Steel truss or beam structure
– Purlins
C/Z sections, material Q235
– Bracing System
Angle steel, round bars
Steel structure building exterior with insulated roof panels on a landscaped site
Steel structure building applications — warehouse, workshop, showroom, mall, hangar, hotel and more

Product overview

Every building in this series is a precision-engineered prefabricated steel system designed and calculated to international building codes, giving the structure an exceptional safety reserve. It pairs high load capacity — proven seismic, wind and snow resistance — with large-span column-free interiors, then ships as a fully prefabricated kit that bolts together dry on site for fast, green, long-life industrial projects.

01Core structure & materials

High-strength steel sections

Primary members are sized by exact engineering calculation for demanding industrial loads.

Automated fabrication

CNC cutting, automatic submerged-arc welding and shot-blasting surface preparation keep every member dimensionally accurate and every joint a precise, bolt-tight fit.

Multi-stage anti-corrosion & fire protection

Optional hot-dip galvanising, epoxy zinc-rich primers or intumescent fireproof coatings stand up to corrosive industrial plants and coastal environments alike.

02Core advantages

01

Large-span, column-free space

Clear-span designs from 30 m to 60 m+ remove interior columns entirely, maximising usable floor area and keeping forklift and logistics lanes fully open.

02

Fast dry construction

Every member is cut, punched and welded in the factory and simply bolted together on site — no wet trades, no on-site welding — cutting overall delivery time by more than 50% versus conventional concrete construction.

03

Green & sustainable

Steel is over 90% recyclable and factory prefabrication slashes site waste and carbon emissions, meeting modern green-building benchmarks.

Steel structure frame, roof and wall build-up diagram with exterior and interior reference photos
Steel structure wall and floor build-up details, custom design and transport

Our Product Specifications

Category Specifications Notes
Main Structure
– Steel Columns H-section, box columns, material Q235/Q345 Custom sizes based on span and load requirements.
– Steel Beams H-section, material Q235/Q345 Supports large spans, up to 60m.
– Roof Truss Steel truss or beam structure Provides stable support for various roof types.
Secondary Structure
– Purlins C/Z sections, material Q235 Standard spacing of 1.5m, customizable.
– Bracing System Angle steel, round bars Ensures structural stability and wind resistance.
– Wall Girts C-sections, material Q235 Connects walls to the main structure, enhancing overall rigidity.
Envelope System
– Roof Sandwich panels (PU/rock wool/glass wool), color steel sheets, single-layer steel plates Thickness 50mm-100mm, provides insulation and waterproofing.
– Walls Sandwich panels (PU/rock wool/glass wool), color steel sheets, single-layer steel plates Thickness 50mm-100mm, combines aesthetics and functionality.
Other Components
– Skylights Translucent panels or glass skylights Provides natural lighting, improves indoor environment.
– Ventilation Equipment Natural or mechanical ventilation systems Customized based on client requirements.
– Drainage System PVC downpipes, steel gutters Ensures effective drainage and prevents water accumulation.
– Doors and Windows Aluminum or steel doors and windows Custom sizes and opening methods available.
Design Parameters
– Span 20m-60m Larger spans available upon request.
– Height 6m-18m Designed based on usage and load requirements.
– Load Capacity Wind load, snow load, seismic load Complies with local building codes.
Materials & Processes
– Steel Q235/Q345, surface treatment (galvanized, painted) Ensures corrosion resistance and aesthetics.
– Connection Methods Bolted or welded connections Ensures structural stability.
Sustainability
– Recyclable Materials 100% recyclable steel Reduces construction waste, aligns with sustainable development.
– Energy Efficiency Optimized envelope and lighting design Reduces energy consumption and improves efficiency.
– Green Building Certification Complies with BREEAM and other green building standards Provides eco-friendly and sustainable building solutions.
Service & Support
– Technical Support Comprehensive support in design, installation, and maintenance Provides detailed installation drawings and remote guidance.
– Warranty 50 years Covers main structure and envelope system.
– Installation Services On-site installation or remote guidance Provided based on client requirements.

Frequently Asked Questions

What is the design life of a steel structure workshop, and how is the steel protected against rust?

Standard steel workshops and warehouses are designed for a 50-year service life, and the main steel structure meets this under normal maintenance. The steel is protected either by abrasive blasting with an epoxy zinc-rich primer or by hot-dip galvanising — hot-dip galvanising is recommended for high-salinity coastal environments. Roof cladding, sealant and similar ancillary items are consumables that need periodic inspection and replacement.

What spans can a steel warehouse achieve, and can a crane be fitted?

Clear spans of 12–36 m are standard without internal columns; larger spans can use trusses or portal frames — the larger the span, the higher the cost and the roof load requirements. Yes, bridge or single-girder cranes can be fitted, typically from 1 t to 50 t; the crane capacity and lifting height must be stated at design stage so the steel columns and corbels can be reinforced.

Can your steel structures meet local wind, snow and seismic requirements?

Yes. Structural calculations follow the wind pressure, snow load and seismic requirements of the project location, and structural calculation reports can be provided to support local plan review and certification.

How long does material production and on-site installation take?

It depends on the area and complexity. For a standard warehouse of about 1,000 m², material production takes roughly 25–40 days and on-site installation typically 15–30 days; rainy seasons and remote locations extend the schedule. Everything ships disassembled and packed, together with the bolts, drawings and installation manual.

How are fire protection, insulation and summer heat handled?

Steel members can be coated with fire-retardant paint to reach Class II or Class I fire rating; if flammable or explosive goods are stored, a dedicated fire protection design with fire walls and fire doors is required. For insulation, common solutions are mineral wool sandwich panels, glass wool with colour-steel sheeting and PU sandwich panels — mineral wool performs better in fire and PU insulates better. An uninsulated colour-steel building does get hot in summer, but with insulation, roof ventilators, skylights, exhaust fans and ventilation louvers the indoor temperature improves significantly.

Do you design the foundation, and what floor slab is required?

We provide foundation drawings and load parameters; foundation construction is normally carried out by a local contractor. The client normally pours the reinforced concrete floor slab to the required capacity — typically 5–10 cm for general storage and 15–20 cm in areas with heavy forklifts. Sloping ground is no problem: column lengths are adjusted to the site levels to form a levelled foundation, avoiding the cost of grading the entire site.

Can the building be extended, raised or given internal partitions and a mezzanine later?

Yes, as long as the structure has reserve load capacity; if no allowance was made in the original design, the structure must be re-checked before modification. Light steel partitions, a second-floor office mezzanine, toilets and switch rooms can all be planned together at drawing stage.

Is roof waterproofing a problem, and how is it handled?

With proper workmanship the risk of leaks is very low. We use overlap waterproofing, sealant, flashing and gutter and downpipe systems. Standing-seam roofing is our first recommendation because it performs better than ordinary overlapping colour-steel sheets.

LET’S BUILD WHAT’S NEXT

Request a quote for your project

Tell us the destination, quantity and timeline — our engineers reply within 24 hours.

Your details are stored under "Project inquiries" in the admin. We never publish your contact information.

Related products

Cookies & privacy

We value your privacy

We use cookies to keep this website working, understand how it is used and show you relevant information. You can accept all of them, reject everything that is not essential, or choose category by category. Your choice is stored for 12 months.